In 2004, following the closure of its chemical plant in Plant City, Florida, Coronet Industries was required to cap several sludge-filled process ponds in accordance with agreements with the Florida Department of Environmental Protection. Because traditional in-situ solidification was not a practical solution, Flint Technical Geosolutions was engaged to field-seam and stage high-strength woven geotextile (HSWG) panels for use in reinforcing the pond caps.

Challenges

Closing inactive sludge ponds is essential to reduce environmental exposure, meet regulatory requirements, and ensure long-term stability. In phosphate mining, soft, compressible sludge, low-shear-strength clays, acidic pore water, and large pond areas make closure particularly challenging. Effective reinforcement and proper cap placement are critical, as improper fill placement can trigger mud waves caused by successive slip failures, creating unstable layers beneath the cap that increase settlement, water infiltration, and long-term maintenance risks.

Solution

The closure plan specified field-seamed high-strength woven geotextile (HSWG) panels for reinforcement, combined with a carefully engineered backfill placement sequence, to safely cap multiple lagoons containing very soft sludge. This approach provided a stable closure system while supporting the environmentally responsible decommissioning of the mining and mineral processing facility.

Benefits

  • An engineered reinforced cap safely isolates sludge, reducing environmental exposure while minimizing water infiltration, erosion, and contaminant migration.
  • It improves long-term stability by limiting settlement, cracking, and construction-induced mud waves, even over soft, highly compressible sediments.
  • The cap also supports vegetation, meets regulatory closure requirements, lowers long-term maintenance costs, and provides a durable, cost-effective solution for the permanent closure of large sludge ponds and environmentally responsible site reclamation.
​

Key Objectives

  • Innovative Alternative to In-Situ Solidification
  • Sludge Separation Layer
  • Sludge Cap Reinforcement
  • Water Quality Improvement

Ready to Start Your Project?

Let's discuss how FTG can deliver proven results for your geotextile project.

Work With Our Team

Have a Similar Challenge?

FTG’s technical team has tackled complex environmental and coastal projects on six continents. Tell us about your site and we’ll recommend the right system.

Free Consultation

Request a Quote

Tell us about your site, budget, and timeline. Our technical team will reply with a custom quote for your environmental or coastal protection project.