Overview

A platinum mine in Zimbabwe was experiencing frequent filter press breakdowns, limiting its ability to dewater the processed ore concentrate produced by the concentrators. This created a production bottleneck and increased the risk of valuable concentrate accumulating within the plant. A TITANTube® dewatering system was introduced to provide additional capacity and support production during filter press downtime.

Challenges

The concentrators continued producing concentrate while the filter presses experienced frequent breakdowns and maintenance interruptions. The available press capacity could not consistently keep up with production, resulting in a backlog of wet concentrate. The mine required a reliable secondary dewatering method that could be implemented without major changes to the existing plant.

Solution

The processed concentrate was conditioned using a selected flocculant before being pumped into TITANTube® geotextile dewatering units. The tubes retained and consolidated the valuable mineral concentrate while allowing clarified water to drain through the geotextile. This provided the mine with additional dewatering capacity while the filter presses were unavailable or operating below the required output.

Benefits

Additional Dewatering Capacity: The tube system supported the filter presses during periods of high production and equipment downtime. Reduced Production Bottlenecks: Concentrator production could continue without relying entirely on the availability of the filter presses. Valuable Product Retention: The processed platinum concentrate was securely retained and consolidated inside the tubes for easier handling.
​

Key Objectives

  • Dewater Processed Platinum Concentrate
  • Support Overloaded Filter Presses
  • Maintain Plant Production During Breakdowns
  • Recover Process Water
  • Reduce Concentrate Storage Requirements

Ready to Start Your Project?

Let's discuss how FTG can deliver proven results for your geotextile project.

Work With Our Team

Have a Similar Challenge?

FTG’s technical team has tackled complex environmental and coastal projects on six continents. Tell us about your site and we’ll recommend the right system.

Similar Projects

Sludge / Sediment Dewatering

Jackson, MS (USA)

Savanna Street Plant

Sludge / Sediment Dewatering

South Africa

Municipal Sludge Waste Dewatering

Sludge / Sediment Dewatering

South Africa

Sand Beneficiation Plant South Africa

Free Consultation

Request a Quote

Tell us about your site, budget, and timeline. Our technical team will reply with a custom quote for your environmental or coastal protection project.